A busy hall
02/12/2021
Knocking at the door
21/05/2021
One to another
Open sesame
09/06/2021
Mid-air ballet
08/12/2021
Sector #1(7): prep work underway
19/11/2021
Gravity supports: first unit
15/01/2021
Up close
Crossing the Hall
15/06/2021
From below
21/06/2021
Temporary rest area
27 assembly-phase lifts
18/05/2021
Vertical ballet
10/08/2021
Thermal shield installed
Horizontal coil PF5 ready for positioning