Just a sliver of space
21/10/2021
First sub-assembly underway
07/09/2021
2 sectors of 9
03/01/2022
Mammoth
06/04/2021
From above
Inspection underway
30/08/2021
Smooth
15/06/2021
Bottom to top
04/06/2021
Ring coil PF5 is in place
16/09/2021
Lower slowly
08/12/2021
Filling up
26/02/2021
Travelling 100 metres
14/01/2021
Second sector assembly underway
Awesome
15/11/2021
The antechamber of the tokamak