Thermal insulation
04/06/2021
Up it goes
14/01/2021
To the end of the building
06/04/2021
Attached to a "strong back"
Transfer day
20/12/2021
Hefty
08/12/2021
The pit, early July
02/07/2021
Rotated inward
26/06/2021
Using the column for access
08/09/2021
Second sector in the wings
19/11/2021
Prepping the toroidal field coils
06/03/2021
Small "barnacles"
13/06/2026
Transferred to SSAT tool #1
How to create a sector sub-assembly
18/05/2021
Next?