09/06/2021
08/12/2021
Sector #1(7): prep work underway
19/11/2021
15/01/2021
08/12/2021
15/06/2021
21/06/2021
09/06/2021
18/05/2021
10/08/2021
21/06/2021
Horizontal coil PF5 ready for positioning
10/08/2021
15/06/2021
Second vertical coil delivered to tool
12/08/2021
09/06/2021