Mammoth
06/04/2021
From above
Inspection underway
30/08/2021
Smooth
15/06/2021
Bottom to top
04/06/2021
Ring coil PF5 is in place
16/09/2021
Lower slowly
08/12/2021
Filling up
26/02/2021
Travelling 100 metres
14/01/2021
Second sector assembly underway
03/01/2022
Awesome
15/11/2021
The antechamber of the tokamak
07/09/2021
Thermal insulation
Up it goes
To the end of the building