A temporary wall
26/04/2016
From a high perch
The Assembly Hall ... from the inside
Space left for tooling
18/06/2013
And off it goes
10/09/2015
Assembly Building: heavy tools to come
21/03/2014
Solidly anchored
08/11/2017
First foot
10/11/2017
Like an Erector set
Imagining the future
22/11/2017
Working as partners
In detail
An assembly of steel beams
07/07/2015
Installing crane beams
12/01/2016
Pillar parts
18/11/2014