Another 48 metres to go
20/11/2014
Beams going up
First level finished on one side
01/12/2014
The base of the machine
04/05/2020
Near the machine pit
21/04/2026
The footprint of a large tool
18/11/2014
Spider Hall
14/10/2015
They've done it!
11/09/2015
800-tonne roof structure lifted 10-11 September 2015
31/08/2015
Framed by rebar
26/07/2016
Mapping out the steel
15/09/2012
Hills and vales of steel
28/11/2012
Lifted at 5 km/hour
10/09/2015
Centimetre by centimetre
Cranes coming soon
26/04/2016