Joining two components in the pit
09/09/2020
Home at last
31/08/2020
Exacting tolerances
Up and over
Lower cylinder is aloft
Into the airlock
22/08/2020
Plenty of space
How to lift
11/11/2020
One segment at a time
02/04/2020
Getting ready
Lower cryostat thermal shield
30/10/2020
Peeking in
07/10/2020
A smaller upending tool
29/09/2020
Close inspection
14/10/2020
30 metres deep
06/05/2020