The Tokamak Complex will rise here
01/02/2013
Six months to pour the concrete
01/02/2013
The last pictures of the seismic pads
01/02/2013
1.5 metre-thick retaining walls
27/09/2011
Temperature-controlled concrete
27/09/2011
26/10/2011
26/10/2011
26/10/2011
15/02/2014
29/11/2013
Installation of embedded plates
08/10/2013
15/02/2014
07/07/2014
20/05/2014
Strong progress in the Seismic Pit
27/05/2014