Last details before the big day
22/10/2019
Upper cylinder advances
Ten metres tall
27/11/2017
Wow!
21/08/2017
Next steps for the cryostat
10/03/2017
Resting horizontally, for now
09/06/2017
Preparing other segments
08/06/2017
Twin underway on the inside
19/06/2019
Upside-down hat
18/06/2019
All lined up
Flying over the base by drone
24/07/2018
Lower cylinder
Disassembled for now
First films
16/12/2016
Giant Erector set
24/02/2017