Inside the hall
10/08/2020
First vacuum vessel sector enters Assembly Hall
07/08/2020
Shrek?
17/09/2020
First one
12/08/2020
Rolling along the rails
26/05/2020
A protective "shell"
25/11/2020
Seen from the top
Lift frame goes along
Warming up
09/09/2020
Cooling manifold installation
07/12/2020
The shine
15/10/2020
Thermal shield(s)
Tall supports
13/11/2020
TF12 delivered
25/04/2020
Unwrapped at ITER
20/06/2020