Eye from the sky
11/07/2017
L1 bioshield
19/12/2016
Next level pouring to start for the Diagnostics Building
20/10/2015
Bioshield takes shape
21/10/2015
Preparing for the bioshield concrete
1/18th of the cryostat crown and bioshield
05/05/2015
Future "Diagnostic Hotel"
Central ring
The heart of construction
A perfect circle
Looking north
Practising on the crown
12/09/2017
Rising in sync
04/09/2017
Early September
A temporary lid
06/08/2017