25/01/2018
Lower cylinder: surveyed from every angle
02/03/2019
07/10/2013
01/06/2010
The four sections of the cryostat
09/04/2026
Housing the pre-assembly of components
21/07/2013
On the inside of the vacuum vessel
09/04/2026
23/07/2013
15/05/2017
06/10/2014
Cryoplant: first steps towards commissioning
25/11/2021
25/11/2021
4.8 km of cryolines pass leak test
09/04/2026
Integrated commissioning at ITER
12/07/2021