From the sky
20/12/2017
Buried piping
28/06/2017
View of the basins
15/05/2017
Columns in the cooling basins
31/05/2017
The design of the heat rejection system
Looking south
In the northern zone of the construction platform
Hot basin covered
19/09/2017
Last stop for the heat of the tokamak
04/09/2019
Installation of cooling fans
16/12/2019
Pumping up
4,540 nozzles
22/01/2020
10t of water per second
Evacuating 1 GW
Last stop