Moving earth
15/06/2008
One year of levelling works
22/09/2008
Two years of preparatory work
27/10/2008
A lot of material
01/01/2008
The 42-hectare ITER platform in Cadarache, France
29/01/2009
X marks the spot
05/05/2006
Equipment installation advances
22/12/2020
The cooling tower area, as the centre of the ITER planet
20/04/2018
Pipes and elbows
13/07/2017
Cooling off
Ready for use
11/09/2019
Starting with the foundations
28/09/2016
An evaporative process
26/10/2017
Heat rejection zone
Cold basin work underway