10-metre-long shafts
23/09/2019
May 2020
27/05/2020
Hot basin, seen by drone
22/03/2017
10 independent cooling cells
A few hundred metres
13/03/2018
Heat rejection zone
25/01/2017
From the sky
20/12/2017
Buried piping
28/06/2017
View of the basins
15/05/2017
Columns in the cooling basins
31/05/2017
The design of the heat rejection system
Looking south
In the northern zone of the construction platform
Hot basin covered
19/09/2017