By "rack" of six
03/02/2012
Installation of vertical sunshades
Ventilation now installed
30/05/2012
On its way
24/05/2011
Occupying the smallest "footprint" in the landscape
Visible progress
Future amphitheatre
Cafeteria nearly finished
21/06/2012
Progress in the Tokamak Pit
12/01/2012
The 500-seat amphitheatre
Meetings galore
11/10/2011
Footbridge to the Control Room
01/12/2010
Facing the platform
14/09/2011
September 2011