Four gyrotrons successfully manufactured in Japan
13/11/2019
Advanced gyrotron design completed in Japan
18/02/2015
Impregnation of first winding pack completed in Japan
11/09/2017
India completes 9,000 in-wall shielding blocks
06/08/2020
Developing the spectrometer in Korea
11/05/2010
Development underway on the diagnostic neutral beam in India
09/07/2010
The prototype cryopump will be built in the Netherlands
07/03/2007
Vacuum components received on site for testing
30/05/2016
Successful test of current lead prototypes in China
15/03/2015
Room-size power supply for SPIDER test bed
15/04/2016
Waveguide prototypes under development in the US
02/10/2017
Poloidal field insert coil manufactured in Japan
30/06/2008
Prototype NbTi superconductor for PF coils jointly tested by Europe and Japan
08/09/2008
Manufacturing cryolines in India
24/10/2018
Cryoplant: inner tank passes leak test in Europe
20/01/2016