Measuring makes it perfect
28/07/2011
Under the ITER Tokamak
21/12/2011
1.5 metres of reinforcement in the lower basemat
Solidifying the two pieces
05/11/2011
Careful measurements
28/11/2011
A concrete box
18/11/2011
A rebar cage for the foundations of the Tokamak Complex
20/07/2011
Storm's coming!
26/05/2013
A long day's work
Stirrups are installed one by one
Rebar rises
06/09/2013
The basement of the Tokamak Complex
22/08/2013
15 metres tall
30/09/2011
Phase 2 concrete
27/09/2011
Rebar for the side walls