30/09/2011
27/09/2011
30/09/2011
30/09/2011
Work on the seismic pads progresses
27/09/2011
23/11/2011
07/12/2012
Building up the rebar to 1.5 metres
20/07/2013
24/07/2013
18/06/2013
08/09/2014
24/04/2012
06/12/2012
The pieces will be assembled here
06/12/2012
05/08/2014