12 plus 2
09/02/2021
Top lid segments unveiled
50% of welding finalized
22/09/2021
Plasma cutting tool
Like a fire-breathing dragon
Top lid: start of assembly
02/02/2021
7 segments assembled
02/03/2021
First "arc"
07/06/2021
Top lid enters stage
23/03/2021
Final verifications
04/07/2019
Fore, mid and aft
The frame is ready, welding can begin
08/07/2016
Full shipment received
18/12/2015
Impressive work, frequent visitors
10/11/2017
A lot of weld material
29/08/2017