The first wall of the Tokamak Complex
16/01/2015
Basement-level walls
Pillars in place
21/04/2015
The bioshield rises
19/01/2017
Closing up the L2 bioshield
14/06/2017
Specially designed openings
From the centre
Working on site in two shifts
Tokamak Complex rising
02/06/2017
Building up around the centre
20/05/2017
Hobbit haven
28/04/2017
Regular access
10/11/2016
The Tokamak Assembly arena
A perfect circle
21/09/2016
Second drain tank
07/04/2016